Construction of Mahindodaya Technological Faculty Project Phase III

Consultancy Service for Construction of Mahindodaya Technological Faculty Project Phase III

Client:Secretary, Ministry of Education, “Isurupaya” Pelawatta, Battaramulla.
(All Island)
Location:Islandwide
Completed:2014-2016
Services:Design & Supervision

Description:
Every school has been supervised by CECB on work request by the each Contractor’s (not onsite supervision). Progress monitoring has been done by head unit at Battaramulla project manager unit and participated all meeting with Client and Contractor’s representative at “Isurupaya” by submitting progress reports. After the project completion buildings have been handed over to the principal with the final supervision of the related divisional engineers.

Relocation of the Manning Market from Pettah to Peliyagoda

Consultancy Services for the Proposed Relocation of the Manning Market from Pettah to Peliyagoda

Client:Ministry
of Rehabilitation and Secretary, Ministry of Megapolis and Western Development
Metro Colombo Urban Development Project Wing A, 12th Floor, Stage II, Sethsiripaya Battaramulla
Location:Peliyagoda
Completed:2016-2020
Services:Design & Supervision

Description:
Relocation project of Manning Market from Pettah to Peliyagoda consist of two main four storey curved buildings (Block A & B), a two storey curved building (Block C), a five storey building (Block D) & two treatment plants with an approximate total floor area of the building is 42,547 m2. Initiated and implemented by the Urban Development Authority (UDA), the new complex spans 15 acres, from the 2 acres previously available for the market in Pettah. Alongside more than 1100 shops and trading spaces that make up the heart of the market, it also comprises cool-rooms, restaurants and cafeterias, medical centers, banks, accommodation and rest areas, and a large car park. Designed by the Central Engineering Consultancy Bureau (CECB), the complex features an environmentally friendly open design that maximizes space and natural light, and large solar arrays on rooftops provide renewable energy for running of the premises.

Construction of Mahindodaya Technological Laboratory Project

Consultancy Service for Construction of Mahindodaya Technological Laboratory Project Phase I & II, 1000 schools Development Project

Client:Secretary,
Ministry of Education, “Isurupaya” Pelawatta, Battaramulla.
Location:Islandwide
Completed:2012-2014
Services:Design & Supervision

Description:
Every school has been supervised by CECB on work request by the each Contractor’s (not onsite supervision). Progress monitoring has been done by head office unit at Battaramulla (project manager unit) and participated all meeting with Client and Contractor’s representative at “Isurupaya” by submitting progress reports. After the project completion buildings have been handed over to the principal with the final supervision of the related divisional engineers.

Relocation of Tangalle Prison Complex to Eraminiyaya, Angunakolapelassa

Relocation of Tangalle Prison Complex to Eraminiyaya, Angunakolapelassa

Client:Ministry
of Rehabilitation and prison reforms
Location:Eraminiyaya,
Angunukolapelessa.
Completed:2014-2017
Services:Design & Supervision

Description:
This site at located at Angunukolapelessa in Hambantota district. Project was proposed to relocate the TangallePrison. Total area of the land is 58 acres& over 100 buildings were planned to construct within this area.The prison was designed to accommodate 2000 prisoners including 50 women inmates. Scope of this work can be categorized as prisoners & functional related buildings, administrative buildings, Canteen Buildings (Staff and Visit Separate),residential buildings, recreational areas, external work and services.
The prison area is consisted of convicted and remands prisoner’s wards, Youth ward, women ward, special cells and punishment cells as prisoner’s buildings and Hospital, bakery and kitchen etc. as the functional related buildings. Industrial training areas have been provided to improve the vocational skill of prisoner as rehabilitation.
There areinternal road network around 2km asphalt roads,environmental friendly sewage treatment plants with zero sludge, Water Supply network including 200m3 capacity water tower, 400m3& 200m3 sumps,Security lighting system, Fire Protection system, LP GasNetwork, vehicle parking’s etc..areprovidedas services. 400m running track & pavilion, indoor stadium, 25m swimming pool are included within the site premises which can be used for the public. 
This prison complex will be the one of major prison in Sri Lanka after the construction.

New Building at NSB Head Office Premises

New Building at NSB Head Office Premises

Client:National Savings Bank
Location:Colombo
Completed:2007-2010
Services:Design & Supervision

Description:
This is a building designed for maximum utilization of area. It consists of two basements mainly catering for parking. The building consists of a spacious entrance lobby, double height auditorium and seventeen floors to be used as office space.  It also includes a separate roof terrace. Total floor area of the building is 18,500m2(approximately). The building consists of RC framed structure with some lift walls designed as shear walls. Flat slabs are used for basements in order to reduce the excavation depth. Secant pile retaining wall is used as the shoring system since the proposed building is surrounded by number of medium rise buildings. The building is supported on 131 number of bored cast in-situ piles ranging diameters from 600mm-1200mm.

Design and Construction of Extension to Repository Building

Design and Construction of Extension to Repository Building

Client:Department of National Archives
Location:Colombo 07
Completed:2010-2013
Services:Design & Supervision

Description:
This building is located at No.07 Reid Avenue, Colombo 07 near the Independence Square. This is a five storied repository building with a floor area is 6, 840 m2.The building has Repositories, Computer room, Reading rooms, Auditorium, Audio Visual Units etc. Building consists of a typical raft and strip foundation. Beams and columns will form a braced RC structure. Roof consists of Zn/Al sheet on steel frame work on Auditorium & RCC roof slab on other area. Passenger lift, dump waiter, fire protection and detection system, Centralized Air Conditioning system, Local area net work and CCTV systems are available in the new building.

Consultancy service for the Construction of a New Head Office Building for Attorney General’s Department Building

Construction of a New Head Office Building for Attorney General’s Department Building

Client:Attorney General’s Department
Location:Colombo 12
Completed:2016-2019
Services:Design & Supervision

Description:
This building was designed to obtain an elegant front view. The overall building consists of Thirteen storeys including two basement floors. Head office building having a gross floor area of 10 000m2. Two basement floors are allocated for garbage colleting room, transformer room, transport room, kitchen and parking is provided for car parking, commercial parking and disable parking. From Ground floor to Eighth floor area are allocated for office rooms where room sizes are increased with the hierarchy and facilitate with required sanitary facilities. The entrance lobby floor was decorated by marvelous granite floor design. An indoor aquarium tank was located in second floor. Ninth floor has an Auditorium constructed in a sloping floor with 250 seats including the balcony to give a clear view of the stage. An open dining area was created at the roof terrace.

Construction of Rest Area on the Southern Expressway

Construction of Rest Area on the Southern Expressway

Client:Sri lanka Insuarance Resorts & Spas (Pvt) Ltd
Location:Welipanna
Completed:2011-2012
Services:Design & Supervision

Description:
The project consists in the construction of a two storeyed building having a floor area of 4,000 Sq.m. with associated building services (Plumbing, Electrical works) and external infrastructure works. This facility includes restaurants, rest areas, children’s play area etc. The building is constructed with an RCC framework on a concrete column foundation which transfers the structural loads. Walls of brickwork with cement mortar plaster. 52 nos. roof trusses made up of 80×100 GI pipes. A toilet facility having a floor area of 102 sq.m. with associated building services. Pumping water from deep well for external water supply including a rain water harvesting facility meeting green requirements for the building.

Construction of Head Office Building for Ministry of Health

Construction of Head Office Building for Ministry of Health

Client:Ministry of Health, Nutrition & Indigenous Medicine
Location:Colombo-08
Completed:2016-2022
Services:Design & Supervision

Description:
This is a 16 storeyed building designed for the maximum utilization of area.  This building accommodates all requirements of the Ministry of Health. The Main Services included for the mechanical requirements of this project are a Central Air Conditioning System, Fire System, Lifts and BAS. The total floor area is approx. 37,650 m2.
The detailed architectural designs produced have incorporated a GREEN building concept in line with the requirements of the GREEN Rating System for Built Environment as developed by the GREEN building Council of Sri Lanka. These attributes will help in optimizing the energy efficiency of the building through the use of increased day lighting, openable windows, usage of solar cells for energy production and utilising water harvesting techniques.