Relaying of 400m and 200m Synthetic Tracks and Modifications to Existing Sports Facilities at Sugathadasa Outdoor Stadium

Relaying of 400m and 200m Synthetic Tracks and Modifications to Existing Sports Facilities at
Sugathadasa Outdoor Stadium


The Sugathadasa National Sports Complex Authority has decided to assign the consultancy services of
this project to CECB based on a Cabinet Decision made in 2017. A site inspection was carried out on
19.07.2025 by the Chairman, the General Manager, and the project staff to review the current
condition of the tracks.


CONSTRUCTION OF PROPOSED BUILDING FOR AMARADEWA ASAPUWA

CONSTRUCTION OF PROPOSED BUILDING FOR AMARADEWA ASAPUWA


Construction of Proposed Building for Amaradewa Asapuwa

Scope of Work: Rectification and Construction of Balance work in Amaradewa Asapuwa, Battaramulla

Client: Ministry of Buddhasasana, Religious and Cultural Affairs

Consultant: CECB

Main Contractor: Sri Lanka Navy (Labour Contribution)

Contract Sum: Rs. 200 Million


CHAIRMAN VISITS KDU Project

KDU Site Visit By CECB Chairman

Site Visit to KDU Project By CECB Chairman to Inspect the present status of construction activities.
Consultant: CECB Main Contractor: SL Army

Project Brief

A five-story building with a concrete (G30) substructure and superstructure, steel roof, and
seating capacity of approximately 1,350. The project commenced in 2015. In June 2020,
CECB was appointed to provide consultancy services for the remaining construction works.
The Sri Lanka Army construction team serves as the main contractor, handling civil and
electrical works. Around 15 specialized contracts cover other disciplines, including air
conditioning, fire detection, and protection systems.
Project Details
Project Cost: Estimated Cost at the initial stage (June 2020) – 789 Mn.
Revised estimate – 3.3 Bn. (Cabinet Approval has been granted)