SWIMMING POOL FOR SIRIMAVO BANDARANAYAKE VIDYALAYA.
Colombo 

Project Profile:  

This is a design project undertaken by C.E.C.B  

The site was almost flat land adjoining to the school premises , facing the school play ground. The architectural design of the project was commenced in early   october 2006 and construction work began in August 2008.

 Idea of the project was to improve skills and abilities of aqua activities of students and promote national and international facilities with in the school premises.Under such project CECB was responsible to design low cost high quality  swimming pool. All aqua activities, changing rooms, office area, recreation space providing in the pool complex .  

The available site area was limited and had to maximize the land usage. Design concept evolved with that site constrains. Building is a solid clear cut building with glass openings in front and both sides. Building was oriented after considering the 400 m running track.  Main service part located in the road side to minimize the disturbance to the play ground. It was decided to increase the use of glass Aluminum to make the building more modern.

Client    - Sirimavo bandaranayake balika vidyalaya 

Estimated Project Cost – 30 M 

Built- up Area - 919sq. m 

Date of start - October 2006 

Date of completion - October 2008


Home | About Us | Consultancy | Constructions | Sectors | Other Services | International | Projects | Tenders | Contact Us | News | Careers
© 2009 - 2014 Sri Lanka - Central Engineering Construction Bureau. Powered by Web Genius
Page: Swimming Pool for Sirimavo Bandaranaike Vidyalaya Sri Lanka - Last Updated: 24th July, 2014 | Site Map